Menü

Projects / Industrial Buildings





During the conversion of the ÖBB Zentralshrwerkstätte to the future 700 apprentices, the Lorenz Consult is involved in the local building supervision.
In doing so, the approximately 10,000 m² site will be expanded into the largest training facility in Austria.
ÖBB Zentrallehrwerkstätte
Steel Construction for a Push Pickling Line in China, Andritz AG

Lorenz Consult plans the steel construction of a push pickling line in China.

Processing Plant, Carinthia

On behalf of Willingshofer GesmbH Lorenz Consult plans the steel construction of a processing plant.

Stahlbauplanung: Kaernten
Adaptations of Buildings and Plants, Magna Steyr Fahrzeugtechnik

As part of the construction change-over of Magna Steyr Fahrzeugtechnik adaptations of buildings and plants were made. Lorenz Consult was responsible for the statics and the planning of the steel construction.

Stahlbauplanung: Magna Steyr Fahrzeugtechnik
Expansion of Steelworks in Tangshan, China, Primetals Technologies Austria GmbH

The production capacity of the existing steelworks was expanded. Lorenz Consult was responsible for the planning of the steel construction.

Expansion of Steelworks in Belgorod, Russia, Primetals Technologies Austria GmbH

In the course of the construction phase, Lorenz Consult was employed to provide engineering support.

 Stahlbauplanung: Stahlwerk Belgrad Primetals Technologies Austria GmbH
Remodelling and Expansion of the Steelworks in Near East, Primetals Technologies Austria GmbH

The existing steelworks was re-modelled and expanded; Lorenz Consult was brought on to carry out the on-site inventory and the structural planning.

Stahlbauplanung: Stahlwerk Primetals Technologies Austria GmbH
Expansion of the Furnace System in Hadeed, Saudi Arabia, Ebner Industrieofenbau GmbH

For this project, Lorenz Consult was engaged for the concrete construction planning, the tender selection, and the on-site construction supervision.

Hot Rolling Mill in Allegheny, PA, USA, Primetals Technologies Austria GmbH

The task of constructing a new hot rolling mill in Allegheny, Pennsylvania included the concrete construction of the industrial facilities, as well as the building construction of offices and electrical facilities. Lorenz Consult was employed for the statics and the overall construction.

Stahlbauplanung: Warmwalzwerk Allegheny Primetals Technologies Austria GmbH
Construction of the Dust Removal Facility in Monlevade, Brazil, Primetals Technologies Austria GmbH

Lorenz Consult carried out the structural planning for the construction of the new production facility.

Production Plant Beizerei 2, Voest-Alpine Austria Draht GmbH

Lorenz Consult took on the role of structural planner for the construction of the Beizerei 2 Production Plant for Voest Alpine Draht GmbH.

Stahlbauplanung: Produktionshalle Beizerei 2, Voest-Alpine Austria Draht GmbH
Steelworks in Atoun, Saudi Arabia, Primetals Technologies Austria GmbH

For the construction of the steelworks in Atoun, Saudi Arabia, Lorenz Consult was responsible for the steel work planning.

Expansion of Continuous Casting Plant CC7, Voest Alpine Stahl GmbH

During the expansion of the production area, Lorenz Consult was responsible for the structural planning of the Linz location’s continuous casting plant.

Hot-Dip Galvanizing Plant 5, Voest Alpine Stahl GmbH

During the expansion of the production area, Lorenz Consult was responsible for the structural planning of the Linz location’s hot-dip galvanizing plant.

Corex Tower C-3000 Bao-Steel II, China, Primetals Technologies Austria GmbH

Lorenz Consult was responsible for the steel construction planning in the course of the steelworks’ expansion.

Stahlbauplanung-Corex
Production Hall, Voest-Alpine Austria Draht GmbH

The general planning and the on-site construction supervision were carried out by Lorenz Consult in the course of the expansion of the plant’s production capacity.

Plant Expansion, Eilsleben, Germany, Schaumann Holding GmbH

The Schaumann-owned company Huelsenberg GmbH & Co. KG expanded its logistics centre. Lorenz Consult was given a general contract to carry out the general planning, project management, architectural planning, statics and construction, building-services engineering, and logistics planning, in addition to the construction supervision.

Stahlbauplanung: Werkserweiterung Eilsleben, Schaumann Holding GmbH
Plant Expansion, Feuchtwangen, Germany, Schaumann Holding GmbH

The expansion of the logistics centre in Feuchtwangen was also carried out by Lorenz Consult for Huelsenberg GmbH & Co. KG. Here Lorenz Consult’s responsibilities were the same as in Eilsleben.

Stahlbauplanung: Werkserweiterung Feuchtwangen, Schaumann Holding GmbH
Expansion of Hall 7, Boehler GmbH

Lorenz Consult was employed to carry out the general planning and the on-site construction supervision.

Stahlbauplanung: Erweiterung Halle7 Böhler
Steelworks Near East, Primetals Technologies Austria GmbH

In the course of the expansion of the steelworks, Lorenz Consult was charged with the structural planning.

Expansion of 2 TS-Hall, Boehler GmbH

In order to increase production capacity, the TS hall was expanded. Lorenz Consult was responsible for the structural planning.

Stahlbauplanung: Erweiterung 2 TS-Halle Böhler


During the conversion of the ÖBB Zentralshrwerkstätte to the future 700 apprentices, the Lorenz Consult is involved in the local building supervision.
In doing so, the approximately 10,000 m² site will be expanded into the largest training facility in Austria.
ÖBB Zentrallehrwerkstätte
Steel Construction for a Push Pickling Line in China, Andritz AG

Lorenz Consult plans the steel construction of a push pickling line in China.

Processing Plant, Carinthia

On behalf of Willingshofer GesmbH Lorenz Consult plans the steel construction of a processing plant.

Stahlbauplanung: Kaernten
Adaptations of Buildings and Plants, Magna Steyr Fahrzeugtechnik

As part of the construction change-over of Magna Steyr Fahrzeugtechnik adaptations of buildings and plants were made. Lorenz Consult was responsible for the statics and the planning of the steel construction.

Stahlbauplanung: Magna Steyr Fahrzeugtechnik
Expansion of Steelworks in Tangshan, China, Primetals Technologies Austria GmbH

The production capacity of the existing steelworks was expanded. Lorenz Consult was responsible for the planning of the steel construction.

Expansion of Steelworks in Belgorod, Russia, Primetals Technologies Austria GmbH

In the course of the construction phase, Lorenz Consult was employed to provide engineering support.

 Stahlbauplanung: Stahlwerk Belgrad Primetals Technologies Austria GmbH
Remodelling and Expansion of the Steelworks in Near East, Primetals Technologies Austria GmbH

The existing steelworks was re-modelled and expanded; Lorenz Consult was brought on to carry out the on-site inventory and the structural planning.

Stahlbauplanung: Stahlwerk Primetals Technologies Austria GmbH
Expansion of the Furnace System in Hadeed, Saudi Arabia, Ebner Industrieofenbau GmbH

For this project, Lorenz Consult was engaged for the concrete construction planning, the tender selection, and the on-site construction supervision.

Hot Rolling Mill in Allegheny, PA, USA, Primetals Technologies Austria GmbH

The task of constructing a new hot rolling mill in Allegheny, Pennsylvania included the concrete construction of the industrial facilities, as well as the building construction of offices and electrical facilities. Lorenz Consult was employed for the statics and the overall construction.

Stahlbauplanung: Warmwalzwerk Allegheny Primetals Technologies Austria GmbH
Construction of the Dust Removal Facility in Monlevade, Brazil, Primetals Technologies Austria GmbH

Lorenz Consult carried out the structural planning for the construction of the new production facility.

Production Plant Beizerei 2, Voest-Alpine Austria Draht GmbH

Lorenz Consult took on the role of structural planner for the construction of the Beizerei 2 Production Plant for Voest Alpine Draht GmbH.

Stahlbauplanung: Produktionshalle Beizerei 2, Voest-Alpine Austria Draht GmbH
Steelworks in Atoun, Saudi Arabia, Primetals Technologies Austria GmbH

For the construction of the steelworks in Atoun, Saudi Arabia, Lorenz Consult was responsible for the steel work planning.

Expansion of Continuous Casting Plant CC7, Voest Alpine Stahl GmbH

During the expansion of the production area, Lorenz Consult was responsible for the structural planning of the Linz location’s continuous casting plant.

Hot-Dip Galvanizing Plant 5, Voest Alpine Stahl GmbH

During the expansion of the production area, Lorenz Consult was responsible for the structural planning of the Linz location’s hot-dip galvanizing plant.

Corex Tower C-3000 Bao-Steel II, China, Primetals Technologies Austria GmbH

Lorenz Consult was responsible for the steel construction planning in the course of the steelworks’ expansion.

Stahlbauplanung-Corex
Production Hall, Voest-Alpine Austria Draht GmbH

The general planning and the on-site construction supervision were carried out by Lorenz Consult in the course of the expansion of the plant’s production capacity.

Plant Expansion, Eilsleben, Germany, Schaumann Holding GmbH

The Schaumann-owned company Huelsenberg GmbH & Co. KG expanded its logistics centre. Lorenz Consult was given a general contract to carry out the general planning, project management, architectural planning, statics and construction, building-services engineering, and logistics planning, in addition to the construction supervision.

Stahlbauplanung: Werkserweiterung Eilsleben, Schaumann Holding GmbH
Plant Expansion, Feuchtwangen, Germany, Schaumann Holding GmbH

The expansion of the logistics centre in Feuchtwangen was also carried out by Lorenz Consult for Huelsenberg GmbH & Co. KG. Here Lorenz Consult’s responsibilities were the same as in Eilsleben.

Stahlbauplanung: Werkserweiterung Feuchtwangen, Schaumann Holding GmbH
Expansion of Hall 7, Boehler GmbH

Lorenz Consult was employed to carry out the general planning and the on-site construction supervision.

Stahlbauplanung: Erweiterung Halle7 Böhler
Steelworks Near East, Primetals Technologies Austria GmbH

In the course of the expansion of the steelworks, Lorenz Consult was charged with the structural planning.

Expansion of 2 TS-Hall, Boehler GmbH

In order to increase production capacity, the TS hall was expanded. Lorenz Consult was responsible for the structural planning.

Stahlbauplanung: Erweiterung 2 TS-Halle Böhler
Graz

Sparbersbachgasse 46
A-8010 Graz
Phone+43 316 8018-0
Fax+43 316 8018-30
e-mailoffice@lorenz-consult.at
Vienna

Erdbergstraße 82 / Top 6
A-1030 Vienna
Phone+43 664 1050097
e-mailoffice@lorenz-consult.at
Berlin

Schönhauser Allee 6-7
D-10119 Berlin