





LKH Univ. Hospital Graz, Surgery Building Stage 3
Project Description
Redevelopment and extension
The object is part of the general renovation of the surgery building complex.
In the third construction phase, the fundamental general refurbishment and expansion of the B wing (extension) will be carried out.
On the one hand, these measures will make it possible to maintain ongoing hospital operations by providing space into which functional units from the existing buildings will be relocated, and on the other hand, they will enable urgently needed renovation work to be carried out in the A wing.
A central emergency room with emergency ward will be built in the TP.
The ground floor is intended to be the access level with a general medical practice in front. On the 1st floor are the PNU and technical areas.
On the 2nd floor there is a surgical research laboratory.
The associated technical equipment is located on the 3rd floor above.
Service rooms, therapy rooms and seminar units are located on all floors.