Labor 2020
Labor 2020

Lab 2020 - Fresenius-Kabi Graz

  • Client
    Fresenius Kabi Austria GmbH
  • Execution
    02/2018 - 09/2020
  • Construction costs
    --
  • Service
    Planning and local construction supervision Building services

Project Description

At the Graz site of Fresenius-Kabi Austria GmbH, the existing northern part of the production building was extended to the 4th floor. The offices on the 2nd floor were demolished and subsequently converted into laboratories with evaluation/offices. The existing columns in this area had to be partly reinforced and sheathed EI90. Subsequently, a steel structure with solid ceilings was added and forms the 3rd floor (laboratory floor) and 2nd floor (technical floor).

Core competencies

Laboratory-BSL